top of page
5TH SEMESTER PROJECT
MULTISTOREY RESEDENTIAL BUILDINGS
The following semester project we were employees at an architect company.
The drawing office got an inquiry from a local housing cooperative who owns an old apartment
building, at which the drawing office was responsible for making an urban renewal.
The overall background to this proposal was to provide a new bathroom and kitchen for each
apartment, as well as to install an elevator in the building. At the same time, it is requested that residents
have an internal access to both the basement and the courtyard without going outside.
Developed by
Patrick Gisselmann & Emils Maksims
Scenario
Brief
Schematic Design 3
Location Plan
Site Plan
Elevation South (Demolition)
Elevation South (Complete)
Section C-C (Existing)
Section C-C (Demolition)
Section C-C (Complete)
Basement Plan (Demolition)
Basement Plan (Complete)
Ground Floor Plan (Demolition)
Ground Floor Plan (Complete)
1st Floor Plan (Demolition)
1st Floor Plan (Complete)
1st Floor Plan - Waste Water
1st Floor Plan - Electricity
1st Floor Plan - Ventilation
1st Floor Plan - Heating
Health and Safety Plan
Ground Floor Steel
Steel Element Drawing
Steel Section
Beam to Existing Wall
Beam to Existing Floor Joist
Beam to Column
Beam to Basement Wall
bottom of page