5TH SEMESTER PROJECT

MULTISTOREY RESEDENTIAL BUILDINGS
The following semester project we were employees at an architect company.
The drawing office got an inquiry from a local housing cooperative who owns an old apartment
building, at which the drawing office was responsible for making an urban renewal.
The overall background to this proposal was to provide a new bathroom and kitchen for each
apartment, as well as to install an elevator in the building. At the same time, it is requested that residents
have an internal access to both the basement and the courtyard without going outside.
Developed by
Patrick Gisselmann & Emils Maksims

Scenario

Brief

Schematic Design 3

Location Plan

Site Plan

Elevation South (Demolition)

Elevation South (Complete)

Section C-C (Existing)

Section C-C (Demolition)

Section C-C (Complete)

Basement Plan (Demolition)

Basement Plan (Complete)

Ground Floor Plan (Demolition)

Ground Floor Plan (Complete)

1st Floor Plan (Demolition)

1st Floor Plan (Complete)

1st Floor Plan - Waste Water

1st Floor Plan - Electricity

1st Floor Plan - Ventilation

1st Floor Plan - Heating

Health and Safety Plan

Ground Floor Steel

Steel Element Drawing

Steel Section

Beam to Existing Wall

Beam to Existing Floor Joist

Beam to Column

Beam to Basement Wall