top of page

3RD SEMESTER PROJECT  

3000 m2 - MULTIPURPOSE SPORTS HALL

For the 3rd semester project, the team was provided with a complete Outline Proposal from an external Architect company. The team had the task to analyze and improve all the problematic areas according to the technical design. Along side optimizing our professional communication skills.


Apart from dealing with technical consultancy, this semester gave us the opportunity to work as a production company, designing wooden elements, developing production drawings in full detail; as well as working as a mounting contractor, developing the needed set of site drawings and specific documentation.

 

 

Developed by

Patrick Gisselmann, Emils Maksims, Antonio Vachev and Reinis Liepins

 

bottom of page